Findings

Positive Findings by State Expert Review (GGE), State Ecological Expert Review (GEE) and Industrial Safety Expert Review obtained by Giprosintez since 1999

Design documentation for construction, renovation, overhaulExpert authority, Ref. No. of findings
Seven steel tanks’ farm renovation (tanks No. 9 to 15). Design documentation and engineering survey data Non-Governmental Expert Review Conclusion No.34-2-1-3-004828-2020 dated 26 February 2020
Retrofitting for the Coloring Agents Wet Production Technology Development project; VGAZ-SUAL, Volgograd (Reg. No. A54-02654-0137, hazard class III) Industrial safety expert review conclusion Reg. No. 39-TP-02085-2020 dated 5 February 2020
Design documentation. Feedstock discharge site No.2 Nongovernmental expert review conclusion No. 34-2-1-2-001919-2020 dated 29 January 2020
Hazardous industrial facility retrofitting project. Belt conveyor No. 26B replacement. Soda ash shop, calcination area No. 1. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No. 92U-16-31-903-LK26B Industrial safety expert review conclusion No. 19-PD-19 OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-64918-2019 dated 29 November 2019
Hazardous industrial facility retrofitting project. Belt conveyor No. 5B replacement. Soda ash shop, calcination area No. 1. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No. 92U-16-31-903-LK5B Industrial safety expert review conclusion No. 18-PD-19 OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-64825-2019 dated 29 November 2019
Enhancement of casting area No. 1 to set up sacrificial alloy manufacture (Ref. No. А54-02654-0097, hazard class II) AO RUSAL Ural Volgograd Industrial safety expert review conclusion Ref. No. 39-TP-20534-2019 dated 5 November 2019 (Ref. No. А54-02654-0097, hazard class II)
Cost estimate verification for the project of Novosibirsk Russian National Guard’s military camp renovation ( phase 2, club and utilities) State Expert Review Center’s conclusion on defense and security facilities operated by Russian National Guard No. 77-1-0117-19 dated 1 November 2019
Hazardous industrial facility retrofitting project. Belt conveyor No. 3 replacement. Soda ash shop, calcination area No. 2. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No.73-U-16-31-900-LK3 Industrial safety expert review conclusion OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-50565-2019 dated 24 October 2019
Hazardous industrial facility retrofitting project. Belt conveyor No. 4 replacement. Soda ash shop, calcination area No. 2. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No.73-U-16-31-900-LK4 Industrial safety expert review conclusion OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-50570-2019 dated 24 October 2019
Retrofitting of aluminum powder and aluminum paste production department No. 2, plow mixer installation, code 27-956 Industrial safety expert review conclusion No. 01-TP-0374-19 dated 14 August 2019. Ref. No. А54-02654-0140, hazard class III
Design documentation. Chemical weapons destruction facility cleanup, Kizner, Republic of Udmurtia State Expert Review Conclusion dated 22 May 2019 Approved by order No. 244 dated 28 May 2019
Design documentation. Solid industrial waste landfill renovation, RUSAL Volgograd, AO RUSAL Ural Environmental Expert Review Conclusion No. 27 dated 31 May 2019 Approved by order No. 101/OD dated 31 May 2019
Design documentation and engineering survey data. Four steel tanks‘ warehouse renovation (tanks 5-8, 00005279) Non-Governmental Expert Review Conclusion No. 34-2-1-3-012932-2019 dated 30 May 2019
Design documentation and engineering survey data. Four steel tanks‘ warehouse renovation (tanks 1-4, 00005253) Non-Governmental Expert Review Conclusion No. 34-2-1-3-012561-2019 dated 28 May 2019
Cost estimate verification. Buildings Renovation (Phase 2), capital construction project State Expert Review Conclusion 00194-19/RGE-10928/604 dated 20 May 2019
Design documentation and engineering survey data. Buildings Renovation (Phase 2), capital construction project State Expert Review Conclusion 34-1-1-3-011484-2019 dated 17 May 2019
Hazardous facility retrofitting documentation. Pulp shops area, AO Mondi Syktyvkar; liquor circulation modification for digesters Kamyur-1 and Kamyur-2 (stage 2) Environmental Expert Review Conclusion No. 025-TP dated 24 April 2019 No. 25-TP-2019
Class II hazardous facility retrofitting documentation. OPOА25-00035-0012. Pulp shops area, top head replacement for digester Kamyur-3 Environmental Expert Review Conclusion No. 101/19-TP dated 16 April 2019
Nitrogen pipeline between tie-in in unit 6 and pilot plant in unit 4 Environmental Expert Review Conclusion No. 01-TP-0271-19 dated 11 April 2019
Class I hazardous facility retrofitting documentation. Industrial area No.1, AO Bashkirskaya Sodovaya Kompaniya, Ref. No. А41-00092-005. Off-gas hydrochloric acid production retrofitting, building 1404B shop No.18 Environmental Expert Review Conclusion No.899-2019 dated 08 April 2019 Ref. No. 41-TP-20170-2019
Design documentation and engineering survey data. Herbicides shop at AO Kaustik Volgograd Non-Governmental Expert Review Conclusion No. 34-2-1-3-006677-2019 dated 27 March 2019
Cost estimate verification. Russian National Guard’s Hospital No. 7 Construction Project State Expert Review Conclusion 77-1-0327-18 dated 20 December 2018
Design documentation. Russian National Guard’s Hospital No. 7 Construction Project State Expert Review Conclusion 77-1-1-2-0055-18 dated 17 December 2018
Retrofitting documentation. Gas system, OOO Omsktekhuglerod Environmental Expert Review Conclusion No. 01-TP-0136-18 dated 19 July 2018 Ref. No. А61-06327-0005 Hazard class III
Retrofitting documentation. Audio and visual alarm system at drainage, warming and mixing pumping stations and preheaters, OOO Omsktekhuglerod Environmental Expert Review Conclusion No. 01-TU-0135-18 dated 19 June 2018 Ref. No. А61-06327-0009 Hazard class III
Design documentation and engineering survey data. Soil deactivation at decommissioned chemical weapons production facilities at OAO Caprolactam, Dzerzhinsk Nizhny Novgorod region Glavgosekspertiza Conclusion dated 18 June 2018 No. 00035-18/KGE-02416/05 Reg. No. 00-1-1-3-1691-18
Cost estimates verification. Soil deactivation at decommissioned chemical weapons production facilities, Dzerzhinsk Nizhny Novgorod region Glavgosekspertiza Conclusion dated 21 June 2018 No. 00037-18/KGE-02416/05 Reg. No. 00-1-1140-18
Retrofitting documentation. Pulp shops area, Mondi Syktyvkar, upgrade of black liquor concentrator, lamellar heaters replacement at evaporator No.1V; installation of splitter intermediate condenser, extra turpentine settler, liquor flash tank Environmental Expert Review Conclusion No. 036-TP dated 28 April 2018 Ref. No. 25-TP-2018
Retrofitting documentation. Pulp shops area, AO Mondi Syktyvkar; liquor circulation modification for digesters Kamyur-1 and Kamyur-2 Environmental Expert Review Conclusion No. 035-TP dated 25 April 2018 Ref. No. 25-TP-2018
Design documentation. Facility 335/155-5 Missile Field, Buildings and Structures, capital construction project. Sverdlovsk region, Nizhny Tagil district, Svobodny village State Expert Review Conclusion No. 66-1-2-0005-18 dated 20 April 2018
Retrofitting documentation. FFS packer installation in purified sodium bicarbonate packing area, АО Bashkirskaya Sodovaya Kompaniya Industrial safety expert review conclusion dated 09 January 2018 No. 686-2017. Ref. No. 41-TP-02144-2018
Main building No. 1. Installation of 10,000m³ bleached leaf pulp storage tank, installation of 6,000m³ bleached leaf pulp storage tank Non-Governmental Expert Review Conclusion No. 34-2-1-3-0470-17 dated 19 December 2017
Soil deactivation at decommissioned chemical weapons production facilities, OAO Caprolactam, Dzerzhinsk, Nizhny Novgorod region Environmental Expert Review Conclusion dated 26 October 2016 Approved by order No. 690
Permanent facility cost estimate validation under Amendment No. 3 to the Safing and Liquidation Project of former chemical weapons development facility 21-26 (FGUP GosNIIOKHT Shikhany), land reclamation after the liquidation. Glavgosekspertiza conclusion dated 26 July, 2016, No. 835-16/GGE-4738/10
Amendment No. 3 to the Safing and Liquidation Project of former chemical weapons development facility 21-26 (FGUP GosNIIOKHT Shikhany), land reclamation after the liquidation. Glavgosekspertiza conclusion dated 26 July, 2016, No. 834-16/GGE-4738/03
PAO KAMAZ retrofitting project. Logistics center’s acids and alkalis storage (warehouse 79916). Industrial safety expert review conclusion dated 13 May, 2016, No. 43-TP-03908-2016
Design documentation and engineering survey data. Amendment of the feasibility study (draft) for the safing of the chemical weapons destruction facility in Gorny, Saratov region. Glavgosekspertiza conclusion dated 3 March, 2016, No. 228-16/GGE-6058/03
Design documentation and engineering survey for building 1041A construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility Russia’s Glavgosekspertiza Conclusion No. 1771-15/GGE-9925/03 dated 24 December, 2015
Capital project cost estimates verification under design documentation for building 1041A construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility Russia’s Glavgosekspertiza Conclusion No. 1773-15/GGE-9925/10 dated 24 December, 2015
Amendment 3 to design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 – land reclamation Russia’s Glavgosekspertiza conclusion approved by Order No. 1017 dated 16 December, 2015
Engineering documentation for new equipment and production processes under Amendment 3 to design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 – land reclamation Russia’s Glavgosekspertiza conclusion approved by Order No. 1019 dated 16 December, 2015
Development and approval of underground water source health protection zone design for potable water supply to Tank Farm project, RN-Yuganskneftegaz Conclusion by Health and Epidemiology Center of Khanty-Mansi autonomous area Yugra No. ХМ.01.П.00591.12.15 dated 02 December, 15
Design documentation development for clean-up of Schuchye (Kurgan region) chemical weapons storage and destruction facility. Design documentation and engineering surveys. Russia’s Glavgosekspertiza (Main State Expert Review Agency) Conclusion No. 1027-15/ГГЭ-9998/03 dated 28 July, 2015
Design documentation development for clean-up of Schuchye (Kurgan region) chemical weapons storage and destruction facility. Capital project cost estimates verification. Russia’s Glavgosekspertiza Conclusion No.1028-15/ГГЭ-9998/10 dated 28 July, 2015
Design documentation development for building 1041 construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility. Capital project cost estimates verification. Russia’s Glavgosekspertiza Conclusion No. 764-15/ГГЭ-9925/10 dated 25 May, 2015
Design documentation development for building 1041 construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility. Design documentation and engineering surveys. Russia’s Glavgosekspertiza Conclusion No. 761-15/ГГЭ-9925/03 dated 22 May, 2015
Administration building 820-37; Shop No. 8 for Kinef, Kirishi, Leningrad region. Design documentation and engineering surveys. Russia’s Glavgosekspertiza Conclusion No. 333-15/СПЭ-3529/02 dated 5 May, 2015
Feasibility study for chemical weapons destruction facility clean-up in Gorny, Saratov region RF State Ecological Expert Review Agency (GEE) Conclusion of 4 February, 2015, approved by Decree No. 102 dated 9 February, 2015
Cost estimates validation under design documentation development for building 1044 of Kizner chemical weapons destruction facility GGE findings of 16 December, 2014 No. 1592-14/GGE-9519/10
Design documentation and engineering survey data for building 1044 of Kizner chemical weapons destruction facility GGE findings of 15 December, 2014 No. 1585-14/GGE-9519/03
Design documentation development for Shchuchye chemical weapons destruction facility cleanup GEE findings of 28 November, 2014 No. 769
Pre-project planning for design documentation development for Shchuchye chemical weapons destruction facility cleanup GEE findings of от28 November, 2014 No. 770
Design and working documentation for the smelter gas furnaces synchronization project for Ulan-Ude Car and Loco Repair Plant, branch of Zheldorremmash Industrial Safety Expert Review findings of 5 November, 2014 Ref. No.64-TP-01157-2014
Bitumen plant 19-10 at LUKOIL-Permnefteorgsintez, Perm, facility 17-879 Industrial Safety Expert Review findings on retrofitting documentation EPB-34.1-120.14-PD Ref. No. 48-TP-25043-2014 of 6 August, 2014
Pre-project planning for design documentation and engineering survey data for building 1041 of Kizner chemical weapons destruction facility GEE findings of 04 August, 2014 approved by Order No. 494 of 08 August, 2014
Design documentation development for building 1044 of Kizner chemical weapons destruction facility GEE findings of 04 August, 2014, approved by Order No. 503 of 13 August, 2014
Pre-project planning for design documentation development for building 1044 of Kizner chemical weapons destruction facility GEE findings of 04 August, 2014 approved by Order No. 501 of 12 August, 2014
Design documentation development for building 1041 of Kizner chemical weapons destruction facility GEE findings of 04 August, 2014 approved by Order No. 495 of 8 August, 2014
Retrofitting of gas control unit at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation С -TP-04403-2014. Ref. No.39-TP-04403-2014 of 13 May, 2014
Retrofitting of tank farm, compressor plants, flare pumping plant at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-683-2014 Ref. No.39-TP-04404-2014 of 23 April, 2014
Retrofitting; nitrogen piping to centrifugal compressor end seals; maintenance site expansion at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-681-2014 Ref. No.39-TP-03920-2014 of 21 April, 2014
Retrofitting of coke and bitumen plant unit No. 58; dedusting system installation at raw coke storage; coke fines removal system for transporters F-4241В, F-4242В at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-680-2014 Ref. No.39-TP-03921-2014 of 21 April, 2014
Retrofitting of biotreatment and recirculated water supply plants at Kaustik Plant. Pumps and ph-meter installation. Pump automatic interlock and indication system installation at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-679-2014 Ref. No.39-TP-04136-2014 of 22 April, 2014
Retrofitting. Tank car discharge system for tank cars with defective bottom discharge. Condensate pumping system at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-682-2014 Ref. No.39-TP-04137-2014 of 22 April, 2014
Retrofitting of air compressor plant at ООО LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-685-2014 Ref. No.39-TP-03916-2014 of 18 April, 2014
Retrofitting of Flottweg plant oil sludge treatment line at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-684-2014 Ref. No.39-TP-03918-2014 of 18 April, 2014
Phenol oil selective treatment unit at LUKOIL-Volgogradneftepererabotka Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-444-2014 Ref. No.39-TP-02387-2014 of 15.03. 2014
Reconstruction of individual buildings for Hospital 40, Sestroretsk, facility 22-853 State expert review findings No. 78 -1-5-0351-14 of 27 February, 2014
Gazpromneft - Omsk Refinery. Terminal and tank farms Industrial Safety Expert Review findings No. 2013-09-0899 Ref. No.61-TP-00086-2014 of 16 December, 2013
Visbreaker plant adaptation to applicable regulations for Gazpromneft Moscow Refinery Industrial Safety Expert Review findings by Rostekhnadzor cross-regional Directorate No. 193-13 of 03 December, 2013. Ref. No.01-PD-07079-2013 of 24 December, 2013
Fuel plant optimization by adding an amine treatment unit at LUKOIL-Volgogradneftepererabotka GGE findings No. 678 -13GGE-8659/02 of 16 August, 2013
Retrofitting of existing production facilities at Stroyproyekt to provide water heating of buildings 1174 and 428 Industrial Safety Expert Review findings БЭ-PD-63-2013 of 30 July, 2013
Design documentation and measures for LUKOIL-Volgogradneftepererabotka catalytic reformer No. 13 adaptation to effective regulations Industrial Safety Expert Review findings on pre-project planning documentation KHN-PD-808-2013 No. 39-PD-05935-2013 of 27 June, 2013
Cost estimates validation for amendment 2 to the design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 GGE findings No. 445-13/GGE-4738/10 of 29 May, 2013
Amendment 2 to the design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 (Shikhany, Saratov region) GGE findings No. 433-13/GGE-4738/03 of 27 May, 2013
Engineering documentation on liquid waste incinerator (building 27), solid waste incinerator (building 21) and arsenic-contaminated waste decontamination unit (building 78) GEE findings of 23 January, 2013 approved by Order No. 29 of 23 January, 2013
Design documentation for Shchuchye chemical weapons destruction facility 1597. Part 2. Building 101М, sophisticated weapons destruction building GGE findings No. 028-13/GGE-8373/10 of 17 January, 2013
Cost estimates validation for design documentation for Shchuchye chemical weapons destruction facility 1597. Part 2. Building 101М, sophisticated weapons destruction building GGE findings No. 029-13/GGE-8373/10 of 17 January, 2013
Light-duty production facilities to produce organic acids (succinic acid, salicyl-sulphonic acid) and organic acid derivatives at the properties of Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences. Facility 19849.Retrofitting. Industrial Safety Expert Review findings No. 062-12/12-01 of 02 November, 2012
Shchuchye chemical weapons destruction facility (Shchuchye, Kurgan region). Facility 1597. Part 1. Feasibility study amendment. Part 2. Building 101М, sophisticated weapons destruction building GEE findings of 15 October, 2012 approved by Order No. 555 of 15 October, 2012
Amendment No. 2 to design documentation on safing and liquidation of former chemical weapons production facility 21-26 Shikhany GEE findings of 23 May, 2012 approved by Order No. 243 of 24 May, 2012
Design documentation. LABS plant upgrade GGE findings No. 062-12/СПЭ-1941/02 of 15 February, 2012
Design documentation for 2,000 m3/hour hydrogen production by membrane electrolysis at the property of Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region; engineering survey data GGE findings No. 015-11/КРЭ-1182/04 of 31 January, 2011
Cost estimates validation for feasibility study under Gorny chemical weapons destruction facility cleanup project GGE findings No. 544-10/GGE-6058/10 of 23 June, 2010
Feasibility study under Gorny chemical weapons destruction facility cleanup project GGE findings No. 505-10/GGE-6058/03 of 15 June, 2010
Design documentation for the expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS (design estimates update, removal of building 5025) GGE findings No. 027-10/GGE-6530/02 of 20 January, 2010
Design documentation for the renovation of administration building on 30A Raboche-Krestyanskaya ul., Volgograd, to add a separate entrance, construction phase 1 State Expert Review Directorate findings No. 34-1-4-0169-09 of 09 June, 2009
Construction completion for Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences State Expert Review Directorate findings No. 34-1-5-0416-08 of 27 December, 2008
Working design of production building No. 21-1 communicating with building No. 21-7 for Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences (Volograd, ul. 40 Let VLKSM 63). Building structural assessment. Soil survey State Expert Review Directorate findings No. 34-1-1-0307-08 of 10 September, 2008
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Four-vehicle fire station State Expert Review Directorate findings No.18-1-5-0121-08 of 30 May, 2008
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Rail car unloading platform State Expert Review Directorate findings No. 18-1-5- 0120-08 of 30 May, 2008
Feasibility study update for Gorny chemical agents destruction pilot plant. Amendment No. 2. Waste burial ground expansion GGE findings No. 767-07-GGE-4499/03 of 22 October, 2007
Feasibility study update for Gorny chemical agents destruction pilot plant. Amendment No. 2. Reaction mass bituminization unit GGE findings No. 768-07/GGE-4500/03 of 22 October, 2007
Disassembly of building 350 (net of transformer substation, unit 17, repair shops), galleries 3,4 (top floor), 5, ventilation ducts in building 366А, sections of buildings 352 and 353 under former chemical weapons production facilities cleanup project, Novocheboksarsk Khimprom independent plant No. 4, construction phase III GGE findings No. 693-07/GGE-4737/03 of 27 September, 2007
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Industrial area GGE findings No. 604-07/GGE-4423/03 of 24 August, 2007
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Waste burial ground GGE findings No. 603-07/GGE-4829/03 of 24 August, 2007
Feasibility study for safing and liquidation of Shikhany chemical weapons production facility 21-26 (25-714) GGE findings No. 596-07/GGE-4738/03 of 22 August, 2007
Feasibility study for gunpowder production liquidation at Progress Plant, Kemerovo GGE findings No. 547-07/GGE-4451/03 of 31 July, 2007
Amendment No. 3 to feasibility study for Gorny chemical weapons destruction facility construction project to introduce a reaction mass bituminization plant. Kambarka, Republic of Udmurtia (code 10-493-1-38,1-39А,1-39Б,1-40,1-40А,1-41,1-42,1-1/4,1-4/5÷1-4/10,1/3/3) GGE findings No. 346-07/GGE-4434/03 of 24 May, 2007
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Four-vehicle fire station GEE findings of 26.03.2007, approved by Order No. 209 of 06 April, 2007
Shchuchye chemical weapons destruction facility 1597 Industrial Safety Expert Review findings for industrial safety declaration No. 1139-ЭДБ/06 of 15 December, 2006
Kizner chemical weapons destruction facility 1596 Industrial Safety Expert Review findings for industrial safety declaration No. 946-ЭДБ/06 of 9 October, 2006
Feasibility study update for Kizner chemical weapons destruction facility (Republic of Udmurita) Industrial Safety Expert Review findings No. 724-ЭП/06 of 18 August, 2006
Feasibility study update for Gorny chemical weapons destruction facility (Saratov region). Amendment No. 2 GEE findings of 23 June, 2006 approved by Order No. 773 of 10 August, 2006
Environmental impact assessment for Kizner chemical weapons destruction facility (Republic of Udmurita) Public ecological review findings, July 2006
Design update for former chemical weapons production facility cleanup (buildings 350, 352, 353, 366А, galleries 3, 4, 5), solid waste burial site construction, liquid waste incinerator construction and Khimprom Novocheboksarsk’s independent plant No. 4 (facility 05-598), construction phase II. Disassembly and waste disposal activities (to meet GGE findings No. 008-05/GGE-1930/08 of 18 January, 2005 GGE findings No. 1108-05/GGE-1930/08 of 16 December, 2005
Former chemical weapons production facility cleanup (buildings 350, 352, 353, 366А, galleries 3, 4, 5), solid waste burial site construction, liquid waste incinerator construction and Khimprom Novocheboksarsk’s independent plant No. 4 (facility 05-598), construction phase II. Disassembly and waste disposal activities GGE findings No. 24-8-1/10-465 of 13 December, 2001
Feasibility study for Shchuchye chemical weapons destruction facility 1597, phase I GGE findings No. 8-1/10-692-II of 20 January, 2000
Design of Shchuchye chemical weapons destruction facility GEE findings of 16 December, 1999 approved by Order No.781 of 22 December, 1999
Feasibility study update for Gorny chemical weapons destruction pilot plant (facility 1282-OPO) GEE findings of 18 February, 1999 approved by Order No. 92 of 02 March, 1999
            Индекс цитирования.  

 

Our company Licenses and certificates
News Customer feedback
 Effort Findings
History Contacts  

 

© 2003-2020 "Giprosintez" LLC ® /ООО "Гипросинтез" ®
Design Institute of Organic Synthesis Production.