Positive Findings by State Expert Review (GGE), State Ecological Expert Review (GEE) and Industrial Safety Expert Review obtained by Giprosintez since 1999
Design documentation for construction, renovation, overhaul | Expert authority, Ref. No. of findings |
---|---|
Seven steel tanks’ farm renovation (tanks No. 9 to 15). Design documentation and engineering survey data | Non-Governmental Expert Review Conclusion No.34-2-1-3-004828-2020 dated 26 February 2020 |
Retrofitting for the Coloring Agents Wet Production Technology Development project; VGAZ-SUAL, Volgograd (Reg. No. A54-02654-0137, hazard class III) | Industrial safety expert review conclusion Reg. No. 39-TP-02085-2020 dated 5 February 2020 |
Design documentation. Feedstock discharge site No.2 | Nongovernmental expert review conclusion No. 34-2-1-2-001919-2020 dated 29 January 2020 |
Hazardous industrial facility retrofitting project. Belt conveyor No. 26B replacement. Soda ash shop, calcination area No. 1. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No. 92U-16-31-903-LK26B | Industrial safety expert review conclusion No. 19-PD-19 OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-64918-2019 dated 29 November 2019 |
Hazardous industrial facility retrofitting project. Belt conveyor No. 5B replacement. Soda ash shop, calcination area No. 1. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No. 92U-16-31-903-LK5B | Industrial safety expert review conclusion No. 18-PD-19 OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-64825-2019 dated 29 November 2019 |
Enhancement of casting area No. 1 to set up sacrificial alloy manufacture (Ref. No. А54-02654-0097, hazard class II) AO RUSAL Ural Volgograd | Industrial safety expert review conclusion Ref. No. 39-TP-20534-2019 dated 5 November 2019 (Ref. No. А54-02654-0097, hazard class II) |
Cost estimate verification for the project of Novosibirsk Russian National Guard’s military camp renovation ( phase 2, club and utilities) | State Expert Review Center’s conclusion on defense and security facilities operated by Russian National Guard No. 77-1-0117-19 dated 1 November 2019 |
Hazardous industrial facility retrofitting project. Belt conveyor No. 3 replacement. Soda ash shop, calcination area No. 2. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No.73-U-16-31-900-LK3 | Industrial safety expert review conclusion OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-50565-2019 dated 24 October 2019 |
Hazardous industrial facility retrofitting project. Belt conveyor No. 4 replacement. Soda ash shop, calcination area No. 2. Bashkir Soda Company, Sterlitamak, Republic of Bashkiria, No.73-U-16-31-900-LK4 | Industrial safety expert review conclusion OOO Tekhnicheskaya Diagnostika, an expert review contractor Ref. No. 41-TP-50570-2019 dated 24 October 2019 |
Retrofitting of aluminum powder and aluminum paste production department No. 2, plow mixer installation, code 27-956 | Industrial safety expert review conclusion No. 01-TP-0374-19 dated 14 August 2019. Ref. No. А54-02654-0140, hazard class III |
Design documentation. Chemical weapons destruction facility cleanup, Kizner, Republic of Udmurtia | State Expert Review Conclusion dated 22 May 2019 Approved by order No. 244 dated 28 May 2019 |
Design documentation. Solid industrial waste landfill renovation, RUSAL Volgograd, AO RUSAL Ural | Environmental Expert Review Conclusion No. 27 dated 31 May 2019 Approved by order No. 101/OD dated 31 May 2019 |
Design documentation and engineering survey data. Four steel tanks‘ warehouse renovation (tanks 5-8, 00005279) | Non-Governmental Expert Review Conclusion No. 34-2-1-3-012932-2019 dated 30 May 2019 |
Design documentation and engineering survey data. Four steel tanks‘ warehouse renovation (tanks 1-4, 00005253) | Non-Governmental Expert Review Conclusion No. 34-2-1-3-012561-2019 dated 28 May 2019 |
Cost estimate verification. Buildings Renovation (Phase 2), capital construction project | State Expert Review Conclusion 00194-19/RGE-10928/604 dated 20 May 2019 |
Design documentation and engineering survey data. Buildings Renovation (Phase 2), capital construction project | State Expert Review Conclusion 34-1-1-3-011484-2019 dated 17 May 2019 |
Hazardous facility retrofitting documentation. Pulp shops area, AO Mondi Syktyvkar; liquor circulation modification for digesters Kamyur-1 and Kamyur-2 (stage 2) | Environmental Expert Review Conclusion No. 025-TP dated 24 April 2019 No. 25-TP-2019 |
Class II hazardous facility retrofitting documentation. OPOА25-00035-0012. Pulp shops area, top head replacement for digester Kamyur-3 | Environmental Expert Review Conclusion No. 101/19-TP dated 16 April 2019 |
Nitrogen pipeline between tie-in in unit 6 and pilot plant in unit 4 | Environmental Expert Review Conclusion No. 01-TP-0271-19 dated 11 April 2019 |
Class I hazardous facility retrofitting documentation. Industrial area No.1, AO Bashkirskaya Sodovaya Kompaniya, Ref. No. А41-00092-005. Off-gas hydrochloric acid production retrofitting, building 1404B shop No.18 | Environmental Expert Review Conclusion No.899-2019 dated 08 April 2019 Ref. No. 41-TP-20170-2019 |
Design documentation and engineering survey data. Herbicides shop at AO Kaustik Volgograd | Non-Governmental Expert Review Conclusion No. 34-2-1-3-006677-2019 dated 27 March 2019 |
Cost estimate verification. Russian National Guard’s Hospital No. 7 Construction Project | State Expert Review Conclusion 77-1-0327-18 dated 20 December 2018 |
Design documentation. Russian National Guard’s Hospital No. 7 Construction Project | State Expert Review Conclusion 77-1-1-2-0055-18 dated 17 December 2018 |
Retrofitting documentation. Gas system, OOO Omsktekhuglerod | Environmental Expert Review Conclusion No. 01-TP-0136-18 dated 19 July 2018 Ref. No. А61-06327-0005 Hazard class III |
Retrofitting documentation. Audio and visual alarm system at drainage, warming and mixing pumping stations and preheaters, OOO Omsktekhuglerod | Environmental Expert Review Conclusion No. 01-TU-0135-18 dated 19 June 2018 Ref. No. А61-06327-0009 Hazard class III |
Design documentation and engineering survey data. Soil deactivation at decommissioned chemical weapons production facilities at OAO Caprolactam, Dzerzhinsk Nizhny Novgorod region | Glavgosekspertiza Conclusion dated 18 June 2018 No. 00035-18/KGE-02416/05 Reg. No. 00-1-1-3-1691-18 |
Cost estimates verification. Soil deactivation at decommissioned chemical weapons production facilities, Dzerzhinsk Nizhny Novgorod region | Glavgosekspertiza Conclusion dated 21 June 2018 No. 00037-18/KGE-02416/05 Reg. No. 00-1-1140-18 |
Retrofitting documentation. Pulp shops area, Mondi Syktyvkar, upgrade of black liquor concentrator, lamellar heaters replacement at evaporator No.1V; installation of splitter intermediate condenser, extra turpentine settler, liquor flash tank | Environmental Expert Review Conclusion No. 036-TP dated 28 April 2018 Ref. No. 25-TP-2018 |
Retrofitting documentation. Pulp shops area, AO Mondi Syktyvkar; liquor circulation modification for digesters Kamyur-1 and Kamyur-2 | Environmental Expert Review Conclusion No. 035-TP dated 25 April 2018 Ref. No. 25-TP-2018 |
Design documentation. Facility 335/155-5 Missile Field, Buildings and Structures, capital construction project. Sverdlovsk region, Nizhny Tagil district, Svobodny village | State Expert Review Conclusion No. 66-1-2-0005-18 dated 20 April 2018 |
Retrofitting documentation. FFS packer installation in purified sodium bicarbonate packing area, АО Bashkirskaya Sodovaya Kompaniya | Industrial safety expert review conclusion dated 09 January 2018 No. 686-2017. Ref. No. 41-TP-02144-2018 |
Main building No. 1. Installation of 10,000m³ bleached leaf pulp storage tank, installation of 6,000m³ bleached leaf pulp storage tank | Non-Governmental Expert Review Conclusion No. 34-2-1-3-0470-17 dated 19 December 2017 |
Soil deactivation at decommissioned chemical weapons production facilities, OAO Caprolactam, Dzerzhinsk, Nizhny Novgorod region | Environmental Expert Review Conclusion dated 26 October 2016 Approved by order No. 690 |
Permanent facility cost estimate validation under Amendment No. 3 to the Safing and Liquidation Project of former chemical weapons development facility 21-26 (FGUP GosNIIOKHT Shikhany), land reclamation after the liquidation. | Glavgosekspertiza conclusion dated 26 July, 2016, No. 835-16/GGE-4738/10 |
Amendment No. 3 to the Safing and Liquidation Project of former chemical weapons development facility 21-26 (FGUP GosNIIOKHT Shikhany), land reclamation after the liquidation. | Glavgosekspertiza conclusion dated 26 July, 2016, No. 834-16/GGE-4738/03 |
PAO KAMAZ retrofitting project. Logistics center’s acids and alkalis storage (warehouse 79916). | Industrial safety expert review conclusion dated 13 May, 2016, No. 43-TP-03908-2016 |
Design documentation and engineering survey data. Amendment of the feasibility study (draft) for the safing of the chemical weapons destruction facility in Gorny, Saratov region. | Glavgosekspertiza conclusion dated 3 March, 2016, No. 228-16/GGE-6058/03 |
Design documentation and engineering survey for building 1041A construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility | Russia’s Glavgosekspertiza Conclusion No. 1771-15/GGE-9925/03 dated 24 December, 2015 |
Capital project cost estimates verification under design documentation for building 1041A construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility | Russia’s Glavgosekspertiza Conclusion No. 1773-15/GGE-9925/10 dated 24 December, 2015 |
Amendment 3 to design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 – land reclamation | Russia’s Glavgosekspertiza conclusion approved by Order No. 1017 dated 16 December, 2015 |
Engineering documentation for new equipment and production processes under Amendment 3 to design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 – land reclamation | Russia’s Glavgosekspertiza conclusion approved by Order No. 1019 dated 16 December, 2015 |
Development and approval of underground water source health protection zone design for potable water supply to Tank Farm project, RN-Yuganskneftegaz | Conclusion by Health and Epidemiology Center of Khanty-Mansi autonomous area Yugra No. ХМ.01.П.00591.12.15 dated 02 December, 15 |
Design documentation development for clean-up of Schuchye (Kurgan region) chemical weapons storage and destruction facility. Design documentation and engineering surveys. | Russia’s Glavgosekspertiza (Main State Expert Review Agency) Conclusion No. 1027-15/ГГЭ-9998/03 dated 28 July, 2015 |
Design documentation development for clean-up of Schuchye (Kurgan region) chemical weapons storage and destruction facility. Capital project cost estimates verification. | Russia’s Glavgosekspertiza Conclusion No.1028-15/ГГЭ-9998/10 dated 28 July, 2015 |
Design documentation development for building 1041 construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility. Capital project cost estimates verification. | Russia’s Glavgosekspertiza Conclusion No. 764-15/ГГЭ-9925/10 dated 25 May, 2015 |
Design documentation development for building 1041 construction at Kizner (Republic of Udmurtia) chemical weapons destruction facility. Design documentation and engineering surveys. | Russia’s Glavgosekspertiza Conclusion No. 761-15/ГГЭ-9925/03 dated 22 May, 2015 |
Administration building 820-37; Shop No. 8 for Kinef, Kirishi, Leningrad region. Design documentation and engineering surveys. | Russia’s Glavgosekspertiza Conclusion No. 333-15/СПЭ-3529/02 dated 5 May, 2015 |
Feasibility study for chemical weapons destruction facility clean-up in Gorny, Saratov region | RF State Ecological Expert Review Agency (GEE) Conclusion of 4 February, 2015, approved by Decree No. 102 dated 9 February, 2015 |
Cost estimates validation under design documentation development for building 1044 of Kizner chemical weapons destruction facility | GGE findings of 16 December, 2014 No. 1592-14/GGE-9519/10 |
Design documentation and engineering survey data for building 1044 of Kizner chemical weapons destruction facility | GGE findings of 15 December, 2014 No. 1585-14/GGE-9519/03 |
Design documentation development for Shchuchye chemical weapons destruction facility cleanup | GEE findings of 28 November, 2014 No. 769 |
Pre-project planning for design documentation development for Shchuchye chemical weapons destruction facility cleanup | GEE findings of от28 November, 2014 No. 770 |
Design and working documentation for the smelter gas furnaces synchronization project for Ulan-Ude Car and Loco Repair Plant, branch of Zheldorremmash | Industrial Safety Expert Review findings of 5 November, 2014 Ref. No.64-TP-01157-2014 |
Bitumen plant 19-10 at LUKOIL-Permnefteorgsintez, Perm, facility 17-879 | Industrial Safety Expert Review findings on retrofitting documentation EPB-34.1-120.14-PD Ref. No. 48-TP-25043-2014 of 6 August, 2014 |
Pre-project planning for design documentation and engineering survey data for building 1041 of Kizner chemical weapons destruction facility | GEE findings of 04 August, 2014 approved by Order No. 494 of 08 August, 2014 |
Design documentation development for building 1044 of Kizner chemical weapons destruction facility | GEE findings of 04 August, 2014, approved by Order No. 503 of 13 August, 2014 |
Pre-project planning for design documentation development for building 1044 of Kizner chemical weapons destruction facility | GEE findings of 04 August, 2014 approved by Order No. 501 of 12 August, 2014 |
Design documentation development for building 1041 of Kizner chemical weapons destruction facility | GEE findings of 04 August, 2014 approved by Order No. 495 of 8 August, 2014 |
Retrofitting of gas control unit at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation С -TP-04403-2014. Ref. No.39-TP-04403-2014 of 13 May, 2014 |
Retrofitting of tank farm, compressor plants, flare pumping plant at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-683-2014 Ref. No.39-TP-04404-2014 of 23 April, 2014 |
Retrofitting; nitrogen piping to centrifugal compressor end seals; maintenance site expansion at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-681-2014 Ref. No.39-TP-03920-2014 of 21 April, 2014 |
Retrofitting of coke and bitumen plant unit No. 58; dedusting system installation at raw coke storage; coke fines removal system for transporters F-4241В, F-4242В at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-680-2014 Ref. No.39-TP-03921-2014 of 21 April, 2014 |
Retrofitting of biotreatment and recirculated water supply plants at Kaustik Plant. Pumps and ph-meter installation. Pump automatic interlock and indication system installation at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-679-2014 Ref. No.39-TP-04136-2014 of 22 April, 2014 |
Retrofitting. Tank car discharge system for tank cars with defective bottom discharge. Condensate pumping system at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-682-2014 Ref. No.39-TP-04137-2014 of 22 April, 2014 |
Retrofitting of air compressor plant at ООО LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-685-2014 Ref. No.39-TP-03916-2014 of 18 April, 2014 |
Retrofitting of Flottweg plant oil sludge treatment line at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-684-2014 Ref. No.39-TP-03918-2014 of 18 April, 2014 |
Phenol oil selective treatment unit at LUKOIL-Volgogradneftepererabotka | Industrial Safety Expert Review findings on pre-project planning documentation KHN-TP-444-2014 Ref. No.39-TP-02387-2014 of 15.03. 2014 |
Reconstruction of individual buildings for Hospital 40, Sestroretsk, facility 22-853 | State expert review findings No. 78 -1-5-0351-14 of 27 February, 2014 |
Gazpromneft - Omsk Refinery. Terminal and tank farms | Industrial Safety Expert Review findings No. 2013-09-0899 Ref. No.61-TP-00086-2014 of 16 December, 2013 |
Visbreaker plant adaptation to applicable regulations for Gazpromneft Moscow Refinery | Industrial Safety Expert Review findings by Rostekhnadzor cross-regional Directorate No. 193-13 of 03 December, 2013. Ref. No.01-PD-07079-2013 of 24 December, 2013 |
Fuel plant optimization by adding an amine treatment unit at LUKOIL-Volgogradneftepererabotka | GGE findings No. 678 -13GGE-8659/02 of 16 August, 2013 |
Retrofitting of existing production facilities at Stroyproyekt to provide water heating of buildings 1174 and 428 | Industrial Safety Expert Review findings БЭ-PD-63-2013 of 30 July, 2013 |
Design documentation and measures for LUKOIL-Volgogradneftepererabotka catalytic reformer No. 13 adaptation to effective regulations | Industrial Safety Expert Review findings on pre-project planning documentation KHN-PD-808-2013 No. 39-PD-05935-2013 of 27 June, 2013 |
Cost estimates validation for amendment 2 to the design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 | GGE findings No. 445-13/GGE-4738/10 of 29 May, 2013 |
Amendment 2 to the design documentation for safing and liquidation of Shikhany chemical weapons production facility 21-26 (Shikhany, Saratov region) | GGE findings No. 433-13/GGE-4738/03 of 27 May, 2013 |
Engineering documentation on liquid waste incinerator (building 27), solid waste incinerator (building 21) and arsenic-contaminated waste decontamination unit (building 78) | GEE findings of 23 January, 2013 approved by Order No. 29 of 23 January, 2013 |
Design documentation for Shchuchye chemical weapons destruction facility 1597. Part 2. Building 101М, sophisticated weapons destruction building | GGE findings No. 028-13/GGE-8373/10 of 17 January, 2013 |
Cost estimates validation for design documentation for Shchuchye chemical weapons destruction facility 1597. Part 2. Building 101М, sophisticated weapons destruction building | GGE findings No. 029-13/GGE-8373/10 of 17 January, 2013 |
Light-duty production facilities to produce organic acids (succinic acid, salicyl-sulphonic acid) and organic acid derivatives at the properties of Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences. Facility 19849.Retrofitting. | Industrial Safety Expert Review findings No. 062-12/12-01 of 02 November, 2012 |
Shchuchye chemical weapons destruction facility (Shchuchye, Kurgan region). Facility 1597. Part 1. Feasibility study amendment. Part 2. Building 101М, sophisticated weapons destruction building | GEE findings of 15 October, 2012 approved by Order No. 555 of 15 October, 2012 |
Amendment No. 2 to design documentation on safing and liquidation of former chemical weapons production facility 21-26 Shikhany | GEE findings of 23 May, 2012 approved by Order No. 243 of 24 May, 2012 |
Design documentation. LABS plant upgrade | GGE findings No. 062-12/СПЭ-1941/02 of 15 February, 2012 |
Design documentation for 2,000 m3/hour hydrogen production by membrane electrolysis at the property of Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region; engineering survey data | GGE findings No. 015-11/КРЭ-1182/04 of 31 January, 2011 |
Cost estimates validation for feasibility study under Gorny chemical weapons destruction facility cleanup project | GGE findings No. 544-10/GGE-6058/10 of 23 June, 2010 |
Feasibility study under Gorny chemical weapons destruction facility cleanup project | GGE findings No. 505-10/GGE-6058/03 of 15 June, 2010 |
Design documentation for the expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS (design estimates update, removal of building 5025) | GGE findings No. 027-10/GGE-6530/02 of 20 January, 2010 |
Design documentation for the renovation of administration building on 30A Raboche-Krestyanskaya ul., Volgograd, to add a separate entrance, construction phase 1 | State Expert Review Directorate findings No. 34-1-4-0169-09 of 09 June, 2009 |
Construction completion for Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences | State Expert Review Directorate findings No. 34-1-5-0416-08 of 27 December, 2008 |
Working design of production building No. 21-1 communicating with building No. 21-7 for Boreskov’s Institute of Catalysis of Siberian Branch of Russian Academy of Sciences (Volograd, ul. 40 Let VLKSM 63). Building structural assessment. Soil survey | State Expert Review Directorate findings No. 34-1-1-0307-08 of 10 September, 2008 |
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Four-vehicle fire station | State Expert Review Directorate findings No.18-1-5-0121-08 of 30 May, 2008 |
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Rail car unloading platform | State Expert Review Directorate findings No. 18-1-5- 0120-08 of 30 May, 2008 |
Feasibility study update for Gorny chemical agents destruction pilot plant. Amendment No. 2. Waste burial ground expansion | GGE findings No. 767-07-GGE-4499/03 of 22 October, 2007 |
Feasibility study update for Gorny chemical agents destruction pilot plant. Amendment No. 2. Reaction mass bituminization unit | GGE findings No. 768-07/GGE-4500/03 of 22 October, 2007 |
Disassembly of building 350 (net of transformer substation, unit 17, repair shops), galleries 3,4 (top floor), 5, ventilation ducts in building 366А, sections of buildings 352 and 353 under former chemical weapons production facilities cleanup project, Novocheboksarsk Khimprom independent plant No. 4, construction phase III | GGE findings No. 693-07/GGE-4737/03 of 27 September, 2007 |
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Industrial area | GGE findings No. 604-07/GGE-4423/03 of 24 August, 2007 |
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Waste burial ground | GGE findings No. 603-07/GGE-4829/03 of 24 August, 2007 |
Feasibility study for safing and liquidation of Shikhany chemical weapons production facility 21-26 (25-714) | GGE findings No. 596-07/GGE-4738/03 of 22 August, 2007 |
Feasibility study for gunpowder production liquidation at Progress Plant, Kemerovo | GGE findings No. 547-07/GGE-4451/03 of 31 July, 2007 |
Amendment No. 3 to feasibility study for Gorny chemical weapons destruction facility construction project to introduce a reaction mass bituminization plant. Kambarka, Republic of Udmurtia (code 10-493-1-38,1-39А,1-39Б,1-40,1-40А,1-41,1-42,1-1/4,1-4/5÷1-4/10,1/3/3) | GGE findings No. 346-07/GGE-4434/03 of 24 May, 2007 |
Feasibility study update for Kizner chemical weapons destruction facility 1596 (Republic of Udmurita). Four-vehicle fire station | GEE findings of 26.03.2007, approved by Order No. 209 of 06 April, 2007 |
Shchuchye chemical weapons destruction facility 1597 | Industrial Safety Expert Review findings for industrial safety declaration No. 1139-ЭДБ/06 of 15 December, 2006 |
Kizner chemical weapons destruction facility 1596 | Industrial Safety Expert Review findings for industrial safety declaration No. 946-ЭДБ/06 of 9 October, 2006 |
Feasibility study update for Kizner chemical weapons destruction facility (Republic of Udmurita) | Industrial Safety Expert Review findings No. 724-ЭП/06 of 18 August, 2006 |
Feasibility study update for Gorny chemical weapons destruction facility (Saratov region). Amendment No. 2 | GEE findings of 23 June, 2006 approved by Order No. 773 of 10 August, 2006 |
Environmental impact assessment for Kizner chemical weapons destruction facility (Republic of Udmurita) | Public ecological review findings, July 2006 |
Design update for former chemical weapons production facility cleanup (buildings 350, 352, 353, 366А, galleries 3, 4, 5), solid waste burial site construction, liquid waste incinerator construction and Khimprom Novocheboksarsk’s independent plant No. 4 (facility 05-598), construction phase II. Disassembly and waste disposal activities (to meet GGE findings No. 008-05/GGE-1930/08 of 18 January, 2005 | GGE findings No. 1108-05/GGE-1930/08 of 16 December, 2005 |
Former chemical weapons production facility cleanup (buildings 350, 352, 353, 366А, galleries 3, 4, 5), solid waste burial site construction, liquid waste incinerator construction and Khimprom Novocheboksarsk’s independent plant No. 4 (facility 05-598), construction phase II. Disassembly and waste disposal activities | GGE findings No. 24-8-1/10-465 of 13 December, 2001 |
Feasibility study for Shchuchye chemical weapons destruction facility 1597, phase I | GGE findings No. 8-1/10-692-II of 20 January, 2000 |
Design of Shchuchye chemical weapons destruction facility | GEE findings of 16 December, 1999 approved by Order No.781 of 22 December, 1999 |
Feasibility study update for Gorny chemical weapons destruction pilot plant (facility 1282-OPO) | GEE findings of 18 February, 1999 approved by Order No. 92 of 02 March, 1999 |