Русский (RU) English (UK)

Projects


         
YearCustomerProject detailsDesign stage

2015 – 2016 гг.

FGUP GosNIIOkhT Moscow

Addendum No. 3 to Safing and Liquidation Project of former chemical weapons design facility 21-26 Shikhany, to provide for land reclamation

Engineering surveys. Environmental impact assessment. Design documentation, full scope. Detailed documentation, full scope. Activities: - revamp of waste thermal deactivation unit; - liquidation, land reclamation. Obtaining positive opinions of Main State Expert Review (GGE) and State Ecological Expert Review (GEE).

2015 – 2016

FKUZ Rospotrebnadzor’s Volgograd anti-plague research institute

Design documentation and cost estimates for the buildings overhaul project, phase 2

Engineering surveys. Design documentation, full scope. Obtaining positive opinion of GGE. Detailed documentation, full scope.

2015 – 2016

PAO KAMAZ Naberezhnyye Chelny, Tatarstan

Logistics center. Acids and alkalis warehouse.

Engineering surveys. Baseline data acquisition. Detailed documentation development, full scope. Industrial safety expert review

2015

Ministry of Industry and Trade of the Russian Federation Moscow

Construction of Building 1041 at Kizner chemical weapons destruction facility

Engineering surveys. Environmental impact assessment. Design documentation, full scope. Including: - liquid waste incinerator equipped with vent gas treatment system; - auxiliary structures. Obtaining positive opinions of GGE and GEE

2015

Ministry of Industry and Trade of the Russian Federation Moscow

Construction of Building 1041 at Kizner chemical weapons destruction facility (Facility 1596)

Design documentation development. Including: Liquid waste incinerator equipped with vent gas treatment system. Auxiliary structures.

2015

Ministry of Industry and Trade of the Russian Federation Moscow

Four-vehicle fire station construction at Kizner chemical weapons destruction facility (Facility 1596)

Design documentation development, full scope

2015

FKP Gorny, Gorny, Saratov region

Development and expert review of documentation for long-term suspension of hazardous production facilities at FKP Gorny, Gorny, Saratov region

Documentation development for long-term suspension of hazardous facility. Obtaining positive opinion of Industrial Safety Expert Review (EPB)

2015

OAO NPP Salyut Nizhny Novgorod

Design and process documentation development for 1000 kg/year 6N arsine production from AR-PD sodium arsenite

Design documentation, full scope

2015

OOO LUKOIL-Volgogradneftepererabotka Volgograd

Measures to adapt tank No. 4 to applicable regulations

Documentation development for retrofitting. Obtaining positive opinion of EPB

2015

OOO LUKOIL-Volgogradneftepererabotka Volgograd

Large cargo transportation route under the project of diesel fuel hydrotreater No. 16 (P-24-1400/1) retrofitting

Detailed documentation, full scope

2015

OOO Volgogradpromproyekt Volgograd

Installation of Certus steam generator

Documentation development for retrofitting

2015

OOO Volgogradpromproyekt Volgograd

Technical condition survey and industrial safety expert review of building 428, axes В-Н/6-12; В-К/28-36 and А-В/1-2

Technical condition survey, EPB

2015

FGUP GosNIIOkhT, Plant No. 4, Novocheboksarsk, Chuvash Republic

Clean-up of chemical weapons production facility at FGUP GosNIIOkhT Plant No. 4

Field supervision

2015

FGUP GosNIIOkhT Shikhany, Saratov region

Safing and liquidation of former chemical weapons design facility 21-26, FGUP GosNIIOkhT Shikhany; addendum No. 2 to the project of safing and liquidation of former chemical weapons design facility 21-26, FGUP GosNIIOkhT Shikhany

Field supervision

2015

OAO Gazpromneft-ONPZ Omsk

Extra work relating the design of APCS BOV 43/103 security system

Design documentation

2015

Boreskov’s Institute of Catalysis of the Siberian Branch of Russian Academy of Sciences (IK SO RAN), Novosibirsk

Facility 19863, construction of acetic anhydride and cellulose acetate plants for Boreskov’s Institute of Catalysis of the Siberian Branch of Russian Academy of Sciences

Field supervision

2015

IK SO RAN Novosibirsk

Facility 19864, construction of improved small-capacity benzene dicarbonic acid derivatives plants for Boreskov’s Institute of Catalysis of the Siberian Branch of Russian Academy of Sciences

Field supervision

2015

IK SO RAN Novosibirsk

Facility 19865, construction of improved ester plants (malonic ester, polyphenyl ester, trichloroethylphosphate) for Boreskov’s Institute of Catalysis of the Siberian Branch of Russian Academy of Sciences

Field supervision

2015

IK SO RAN Novosibirsk

Facility 19850, construction of state-of-the-art aromatics plants for Boreskov’s Institute of Catalysis of the Siberian Branch of Russian Academy of Sciences

Field supervision

2014 - 2015

OAO Gazpromneft-ONPZ Omsk

Retrofitting of unit L-35/11-1000. Installation of regeneration gas dechlorination system

Assistance to basic design package development and acceptance. Baseline data acquisition, including: - investigation; - engineering surveys. Documentation development for retrofitting, existing unit adaptation to applicable regulations. Obtaining positive opinion of EPB.

2014 - 2015

OOO Volga-Industry, Volgograd

Crop protection chemicals production

Design documentation, full scope. Obtaining positive opinion of EPB

2014 - 2015

OOO Kinef, Kirishi, Leningrad region

Equipment repair shop at deep oil conversion plant

Detailed documentation, full scope, including: - production building; - gas cylinders warehouse; - parking; - general layout, infrastructure lines.

2014 - 2015

Ministry of Industry and Trade of the Russian Federation Moscow

Construction of 5-storey 60-flat residential building at Kizner chemical weapons destruction facility (Facility 1596)

Field supervision

2014 - 2015

OOO NZM, Volgograd

East Lambeyshor, crude processing unit site 550 TKHM rev.0-5

Isometrics package development

2014 - 2015

OOO LUKOIL-Volgogradneftepererabotka, Volgograd

Circulating water supply unit 496 at electric desalter ELOU-AVT-1 715

Process regulations development

YearCustomerProject detailsDesign stage

2014-2014

LUKOIL-Volgogradneftepererabotka

Equipment procurement for the cable rack from 0.4kV switchgear to 142/5 sanitary pumping plan; replacement of cables between 0.4kV switchgear and pump motors (shop 4, area 3)

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Pump connection to the automatic interlock and alarm system (shop 4, area 1)

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Pumps procurement, pH meter installation at the pipeline of Kaustik plant (shop 5, area 5)

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Installation of condensate receiver with three semi-submersible pumps (shop 5, area 5)

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Installation of condensate receiver with three semi-submersible pumps (shop 5, area 5)

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Cable rack construction at combined heat & power plant No. 2; 35kV cable laying from 35 kV outdoor switchgear to the combined heat & power plant.

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Cable rack construction; 6kV cable routing over cable rack; decommissioning; transformer substation connection to 6kV.

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Cable rack construction

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Cable rack construction; cable routing over cable rack from 6kV switchgear to transformer substation

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Cable rack construction between existing cable rack and transformer substation; 6kV cable routing between transformer substations over cable rack

Design and working documentation, expert review assistance, field supervision

2014-2014

LUKOIL-Volgogradneftepererabotka

Lightning protection for compressor plants 96 and 96B

Design and working documentation.

2014-2014

LUKOIL-Volgogradneftepererabotka

Tank farm light tower installation

Design and working documentation.

2014-2014

LUKOIL-Volgogradneftepererabotka

Installation of tank car discharge system for tank cars with defective bottom discharge

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Coke fines removal improvement

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Dust removal system installation at raw coke warehouse

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Fuel gas line maintenance platform enhancement

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Nitrogen receiver installation

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Gas control unit adaptation to safety regulations: - roofing; - ventilation system; - gas detectors

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Installation of Flottweg plant oil sludge treatment line

Design and working documentation, expert review assistance, field supervision.

2014-2014

LUKOIL-Volgogradneftepererabotka

Air compressor installation for catalyst recovery at reformers

Design and working documentation, expert review assistance, field supervision.

2013-2014

Gazpromneft – Omsk Refinery

Water cooling unit for catalytic cracker

Working documentation

2013-2014

LUKOIL-Volgogradneftepererabotka

Upgrade of phenol oil selective treatment unit

Engineering survey, structural survey, design documentation, expert review assistance

2013-2014

Angarskneftekhimproyekt

Tank farm for benzene, pyrolysis resin, C9 (for Angarsk Polymer Plant)

Engineering survey, design and working documentation

2013-2014

RN-Yuganskneftegaz

Tank farm (for natural gas liquids)

Engineering survey, design and working documentation

2012-2014

Construction Committee of St. Petersburg

Reconstruction of individual buildings for Hospital 40, Sestroretsk

Engineering survey, structural survey, design and working documentation, expert review assistance

2013-2014

Lengiproneftekhim

Section 100 for North Kuzbass Refinery

Working documentation ‘KZh’ and ‘KM’

2013-2014

Khimprom Novocheboksarsk

Retrofitting of chloromethane production

Design documentation

2013-2014

Special construction directorate No. 8 of Russia’s Spetsstroy

Building 101М of chemical weapons destruction facility 1597, Shchuchye, Kurgan region

Design and working documentation , technical assistance

2013-2014

Gazpromneft - Omsk Refinery

Terminal and tank farms; corrective actions to meet Rostekhnadzor’s comments

Working documentation

2013-2014

Optical Fiber Systems

Telecommunication and technical optic fiber production plant, 2 startup complex

Process concepts

2013-2014

Teckhprommash

Safing and liquidation of former chemical weapons production plant – Facility 21-26, Shikhany 26

Technical assistance in engineering documentation development

2013-2014

GosNIIOKHT Shikhany

Cleanup of former chemical weapons production plant (buildings 21-26, waste burial ground)

Field supervision

2012-2014

VNIPIneft

Oils production section of integrated hydrocracker, Nizhnekamsk crude refineries

Working documentation for construction and installation activities

2009-2014

GosNIIIKHT, independent plant No. 4

Chemical weapons destruction facility cleanup, Novocheboksarks, Chuvash Republic

Field supervision

2005-2014

Russian Ministry of Industry and Trade

Construction and commissioning of chemical weapons destruction facility 1596, Kizner, Republic of Udmurtia

Design and working documentation, field supervision, technical assistance

CustomerProject detailsDesign stage

KINEF

Centralized repair shop for deep conversion plant

Working documentation

Khim-Trade

Shutdown and liquidation of Khimprom Volgograd

Statements of work for design and the design and working documentation development

Khimmash-Start

R&D for the process line of Shchuchye chemical weapons destruction facility

R&D for technical design

Khimmash-Start

Cost estimates verification for the commissioning and the first startup complex of chemical weapons destruction facility 1596, Kizner, Udmurtia

Cost estimates verification

Neftezavodmontazh Volgograd

Construction of plant Х-13001

Isometric drawings

Boreskov’s Institute of Catalysis, Siberian Branch of Russia’s Academy of Sciences

Research on acetates, esters and derivatives

Working design

Lukoil-Nizhegorodniinefteproyekt, Rostov-on-Don

Oil filling line for LUKOIL-Volgogradneftepererabotka

Working documentation

Gazpromneft Moscow Refinery

Visbreaking plant adaptation to applicable regulations

Engineering survey, technical condition survey, design documentation

CustomerProject detailsDesign stage

VNIPIneft

Working documentation development for oils production section of integrated hydrocracker, Nizhnekamsk crude refineries

Working documentation (construction and installation)

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility construction in Shchuchye, Kurgan region

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility cleanup in Gorny, Saratov region

Feasibility study, working documentation development

Semiconductor-Grade Silicon Plant

3,600 t/year polysilicon plant construction by Continent Energy at the property of Semiconductor-Grade Silicon Plant, Zheleznogorsk, Krasnoyarskiy Krai

Consulting services for investment project expert review

Boreskov’s Institute of Catalysis, Siberian Branch of Russia’s Academy of Sciences, Novosibirsk

Production of organic acids, aromatic compounds and specialty products

Design and working documentation development

TekhProyektEnergo, Pavlodar, Kazakhstan

Infrastructure and special economic zone PAVLODAR development

Feasibility study

Ulan-Ude Car and Loco Repair Plant, branch of Zheldorremmash

Smelter gas furnaces synchronization project

Design and working documentation development

CustomerProject detailsDesign stage

Lengiproneftekhim

Nitrogen plant and liquid nitrogen tank farm в within KINEF deep conversion plant

Equipment vendor documentation acceptance, working documentation development

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility construction in Shchuchye, Kurgan region

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility cleanup in Gorny, Saratov region

Feasibility study, working documentation development

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Working documentation development for 3,000 t/year polysilicon production in Usolye-Sibirskoye, Irkutsk region

Working documentation development

Fioletta Consulting Limited, объект Khimprom Novocheboksarsk

Existing production capacities

Technical and ecological expert review

GosNIIOKHT

Former chemical weapons production facility cleanup (buildings 350, 352, 353, 366А, galleries 3, 4, 5), solid waste burial site construction, liquid waste incinerator construction and Khimprom Novocheboksarsk’s independent plant No. 4, construction phase II. Disassembly and waste disposal activities

Working documentation clarification

CustomerProject detailsDesign stage

Lengiproneftekhim

Nitrogen plant and liquid nitrogen tank farm в within KINEF deep conversion plant

Equipment vendor documentation acceptance, working documentation development

KINEF, Kirishi, Leningrad region

Revamp of LABS plant

Working documentation development

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility construction in Shchuchye, Kurgan region

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility cleanup in Gorny, Saratov region

Feasibility study, working documentation development

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Working documentation development for 3,000 t/year polysilicon production in Usolye-Sibirskoye, Irkutsk region

Working documentation development

RUSTEP

Construction of new 50,000 t/year styrene-butadiene TEP production plant at the property of Voronezhsintezkauchuk, Voronezh

Assistance, verification, basic design acceptance

KHEVEL

PV module plant construction at Khimprom Novocheboksarsk

Structural and ecological survey

Cinef-Engineering

2,000 m3/hour hydrogen production by membrane electrolysis at the property of Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Design and working documentation development

SMV Engineering

Solar-grade polysilicon plant at existing chemical & metallurgical facility in South Africa

Process section for pre-feasibility study

Kavkazkabel Cable Plant, Prokhladny, Stavropol Krai

Optical fiber production expansion to include 5000 tpa soft cable compound production

Working documentation development

Sibur-Holding

Feasibility study for concentrated trimethyl carbonate production expansion

Feasibility study

CustomerProject detailsDesign stage

Lengiproneftekhim

Nitrogen plant and liquid nitrogen tank farm в within KINEF deep conversion plant

Equipment vendor documentation acceptance, working documentation development

KINEF, Kirishi, Leningrad region

Revamp of LABS plant

Working documentation development

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Expansion of Usolye-Sibirski Silicon’s existing trichlorosilane plant to produce 25,000 t/year of semiconductor-grade pure TCS

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility construction in Shchuchye, Kurgan region

Design and working documentation development

Russian Ministry of Industry and Trade

Chemical weapons destruction facility cleanup in Gorny, Saratov region

Feasibility study, working documentation development

Boreskov’s Institute of Catalysis, Siberian Branch of Russia’s Academy of Sciences

Объект 19425. «Опытный химический завод Волгоградского научно-инженерного центра. Опытная модульная установка для отработки технологических процессов тонкого органического синтеза («Уфа-1»). Опытное производство органических реактивов и высокочистых веществ («Уфа-2») в соответствии с действующей нормативно-правовой и нормативно-технической документацией" («Завершение строительства оьбъектов» Волгоградского филиала Учреждение Российской академии наук Института катализа им. Г.К. Борескова Сибирского отделения РАН)»

Внесение изменений в рабочий проект

Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Working documentation development for 3,000 t/year polysilicon production in Usolye-Sibirskoye, Irkutsk region

Working documentation development

RUSTEP

Construction of new 50,000 t/year styrene-butadiene TEP production plant at the property of Voronezhsintezkauchuk, Voronezh

Assistance, verification, basic design acceptance

KHEVEL

PV module plant construction at Khimprom Novocheboksarsk

Structural and ecological survey

Cinef-Engineering

2,000 m3/hour hydrogen production by membrane electrolysis at the property of Usolye-Sibirski Silicon, Usolye-Sibirskoye, Irkutsk region

Design and working documentation development

YearCustomerProject detailsDesign stage

2008

Russian Silicon

Construction of Abakan semiconductor plant

Design documentation development

2007-2008

GosNIIOKHT Shikhany, Saratov region

Safing and liquidation of former chemical weapons production plant, facility 21-26

Working documentation development

2008

ОАО LUKOIL-Rostovneftekhimproyekt

Revamp of aromatic extraction unit within catalytic reformer

Technical assistance, basic design acceptance

2008

System AP

Feedstock and product metering systems for Kauchuk plant, Volzhskiy

Design documentation development

2007-2008

Sebryakovtsement

Grinding, separation and vent gas treatment plant (closed-loop equipment)

Working documentation development

2007-2008

YaregaRuda

Yarega Mining & Chemical facility. Titanium dioxide plant

Feasibility study

2008

ООО LUKOIL-Komi

Chlorine production from Yarega oil-titanium field formation water for titanium coagulant pilot plant

Feasibility study

1997-2007

Russian Ministry of Industry and Trade

Chemical weapons destruction facility 1282-OPO in Gorny, Saratov region

Feasibility study, feasibility study updateworking documentation development

2006

Russian Ministry of Industry and Trade

Former chemical weapons production facility cleanup at Khimprom Novocheboksarsk’s independent plant No. 4, construction phase II

Working design development

2006

Russian Ministry of Industry and Trade

Former chemical weapons production facility cleanup at Khimprom Novocheboksarsk’s independent plant No. 4, construction phase II

Working design development

2005-2006

Progress Plant, Kemerovo

Gunpowder plant liquidation /p>

Design and working documentation development

2005

Kommunar Plant, Kemerovo

Hazardous waste disposal, soil remediation

Design and working documentation development

2005

Barrikady Plant, Volgograd

Reconstruction and retrofitting of munitions disposal complex

Design documentation development

2003-2004

Giredmet

Polysilicon plant in Laeshan, China. Trichlorosilane and chlorosilane purification shops

Working design development (detailed design) and approvable part (basic design)

2003-2004

Caprolactam-Dzerzhinsk, Dzerzhinsk, Nizhniy Novgorod region

Former chemical weapons destruction facility cleanup in Dzerzhinsk, Nizhniy Novgorod region

Working documentation development

2003-2004

Aivotek, Moscow

Acid sludge processing plant with 5,000 t/year feedstock processing capacity, finished products – fuel and coke

Working design development

2003-2004

Independent plant No. 4 of Khimprom Novocheboksarsk, Chuvash Republic

Cleanup of former chemical weapons production plant at Khimprom Novocheboksarsk’s independent plant No. 4

Working design development

1995

Khimprom Novocheboksarsk, Chuvash Republic

Sodium percarbonate, sulfonyl urea

Working design development

1993

Kaustik plant, Volgograd

Paraffin wax

Working design development

1993

Kaustik plant, Volgograd

Modified starch

Working design development

1993

Kaustik plant, Pavlodar, Kazakhstan

Soft cable compound

Working design development

1993

Orgsintez plant, Volzhskiy, Volgograd region

Carbon sulfide, magnesia, methyl chloride

Working design development

1993

Kaustik plant, Volgograd

Magnesia, methyl chloride, oiling compounds

Working design development for pilot plant

1992

KhMZ Podolsk, Moscow region

Trichlorosilane

Working documentation development

1992

Khimprom Novocheboksarsk

Hydrolized dimethyl chlorosilane; chlorine and caustic plant expansion; trietanolamine

Working documentation development

1992

Kaustik plant, Volgograd

Bromine

Working documentation development

1991

Kaustik plant, Volgograd

Soft cable compound

Working documentation development

1991

Metanol, Gubakha, Perm Krai

Hydrogen

Working documentation development

1990

Kaustik plant, Pavlodar

Caustic soda and chlorine production by membrane method

Working documentation development

1989

Kremniypolimer plant, Zaporozhye, Ukraine

Monosilane

Design update

1989

Khimprom Novocheboksarsk

Acetone anil (stabilizer for rubber items and tires) production

Design and working documentation development

1989

Kaustik plant, Volgograd

Caustic soda and chlorine production by membrane method

Working documentation development

1989

Kaustik plant, Pavlodar

Caustic soda and chlorine production by membrane method

Design documentation development

1989

Khimprom Novocheboksarsk

Revamp of chlorine and caustic production

Design documentation development

1988

Khimprom, Volgograd

Khladon-502

Working design development

1987

Kremniypolimer, Zaporozhye, Ukraine

Polymethylsiloxane, monosilane, polysilicone, silicon oil К-21, parachlorobenzotrifluoride

Design and working documentation development

1986

Khimprom Novocheboksarsk

Oxyethylidenediphosphonic acid

Working documentation development

1986

Navoiazot, Uzbekistan

Flotation agent thiurea

Корректировка рабочей документации

1985

Kaustik plant, Pavlodar, Kazakhstan

Flotation agent flotol-7,9

Working documentation development

1985

Pilot plant, Dzerzhinsk, Nizhniy Novgorod region

Sodium and potassium boranes

Working documentation development

1984

Khimprom Novocheboksarsk

Мmethylchlorosilanes

Feasibility study

1983

Kremniypolimer, Zaporozhye, Ukraine

Monosilane and polysilicon

Feasibility study

1983

Khimprom Novocheboksarsk

Polyampholyte

Working documentation development

1983

Khimprom, Volgograd

Lacquer ХП-734

Working documentation development

1983

Kremniypolimer, Zaporozhye, Ukraine

Parachlorotoluene

Working documentation development

1982

Kaustik plant, Pavlodar, Kazakhstan

Parachlorobenzotrifluoride, phosphorus trichloride

Working documentation development

1982

Khimprom, Volgograd

Diethylchlorthiophosphate

Working documentation development

1982

Khimprom Novocheboksarsk

Aminotris(methylenephosphonic acid); caustic production expansion; polyethylsiloxane

Working documentation development

1981

Kaustik plant, Pavlodar, Kazakhstan

Hydrel ripening accelerator; PVC pipes

Working documentation development

1981

Khimprom, Volgograd

Revamp of chlorine and caustic production

Working

1979

BOR, Dalnegorsk, Primorskiy Krai

Hydrogen peroxide production by quinone method

Feasibility study

1977

Altaikhimprom, Slavgorod, Altaiskiy Krai

Sodium dichloroisocyanurate

Feasibility study

1977

Kaustik plant, Pavlodar, Kazakhstan

Extra-pure aluminum chloride

Working documentation development

1977

Khimprom, Volgograd

Khladon-113

Working documentation development

1975

Khimprom Novocheboksarsk

Acetone anil

Detailed design of production process/p>

1975

ОАО Синтез, Dzerzhinsk, Nizhniy Novgorod region

Hydrogen peroxide production by quinone method

Feasibility study

1975

Khimprom Novocheboksarsk

Hydrogen peroxide production by isopropyl method

Detailed design of production process

1962-1975

Khimprom Novocheboksarsk, Chuvash Republic

Ethyl silicate-40, TEOS, dehydrated ethyl alcohol, lacquer KO-075, modifier FES-80, PFGOS-4 with related feedstock, liquid GKZH-11, enamel KO-174M, paint EKO-124, chlorinated monomers, ammonium sulfamate, santochinum, p-nitrobenzoic acid, p-nitrobenzoyl chloride, softening agent-1, monomer-44, chloromethanes, polycarbonates, polyol mixtures, trichloroethylphosphite, GZh-FK liquids, oxyfos

Working documentation development

1962-1975

Kaustik plant, Pavlodar, Kazakhstan

Salting inhibitor, flotation agents, oil additives, paraffin wax

Working documentation development

1962-1975

Kaustik plant, Volgograd

Medications, vanillin production feedstock, 1 phenyl-3 methylpyrazolon-5, pharmaceutical industry feedstock, modifiers, silicon tetrachloride, sulfonates, carbon tetrachloride, triphenylphosphate, tributylphosphate, metaphos, chlorophos, captan, phtalan, chloromethanes, trichloroethylene, phosphorus trichloride

Working documentation development

1962-1975

Kremniypolimer, Zaporozhye, Ukraine

Benzoic trichloride, hexamethyldisilazane

Working documentation development

1962-1975

Silan, Dankov, Lipetsk region

Hexamethyldisiloxane; propellant feedstock

Working documentation development

1962-1975

Chemical plant, Chapayevsk, Samara region

MCAA sodium salt; insecticides/herbicides

Working documentation development

1962-1975

Fosfor plant, Tolyatti, Samara region

Phthalophos, carbophos, phosphorus trichloride, trichloroethylphosphate, tricresilphosphate, triethyllphosphate

Working documentation development

1962-1975

Pervomaiskiy Chemical Plant, Kharkov region, Ukraine

Lime chloride

Working documentation development

1962-1975

Khlorvinil Group, Ukraine

Zineb, polycarbocyne

Working documentation development

1962-1975

Kaustik plant, Sterlitamak

Hydrogen peroxide production by quinone method

Feasibility study

1962-1975

Turkey, Bulgaria, Poland

Hydrogen peroxide production by quinone method

Basic design of production process

            
  Индекс цитирования.
   

© 2003-2016 "Giprosintez" LLC ® /ООО "Гипросинтез" ®
Design Institute of Organic Synthesis Production.